Our Technical Infrastructure

M/S. MOHITE & SONS takes pride in maintaining a massive, highly-advanced inventory of in-house machinery and formwork. This allows us to drastically reduce dependency on third-party rentals, ensuring projects are delivered on time without compromising on quality.

Concreting & Core Machinery

Sr. No. Name of Equipment Quantity / Capacity
1Concrete Batching and Mixing Plant3 Nos.
2Cement Silo100 Tons
3SCADA Software with PWD Site Integration1 Nos.
4 Schwing Stetter Concrete Pump
  • a) Model 1200
  • b) Model BP 350

2 Nos.
1 Nos.
5 Concrete Mixers
  • a) 10/7
  • b) 14/10 Reversible
  • c) 7/5

20 Nos.
4 Nos.
4 Nos.
6 Concrete Surface Vibrator (Greaves)
  • a) Diesel Vibrator
  • b) Electrical Vibrator

10 Nos.
4 Nos.
7 Concrete Needle Vibrator
  • a) 60 mm
  • b) 40 mm
  • c) 25 mm

10 Nos.
10 Nos.
10 Nos.
8Mini Crane (500 kgs Capacity)2 Nos.
9 Concrete Testing Material
  • a) Cube testing machine (1000 KN)
  • b) Cube moulds
  • c) Sieves Sets
  • d) Slump Cones

3 Nos.
100 Nos.
10 Nos.
10 Nos.
10Weigh Batches5 Nos.
11Concrete Demolishing Hammer5 Nos.
12Bar Cutting Machine5 Nos.
13Wood Cutter & Planning Machine25 Nos.
14Hoist10 Nos.
15Re Baring Machine15 Nos.
16Drill Machine20 Nos.
17Generator2 Nos.

Transport Vehicles

Name of Vehicle Quantity
Mahindra Tractor with Dumping Trolley1 Nos.
TATA Truck1 Nos.
JCB Excavator1 Nos.

Surveying Instruments

Any other surveying instruments are procured instantly as per site requirements.

Instrument Name Quantity
Dumpy Level10 Nos.
Auto Level10 Nos.
Aluminium Leveling Staffs15 Nos.
Theodolite8 Nos.

RCC Formwork Material

  • MS Centering Plates 11,000 Nos.
  • Props 11,000 Nos.
  • Spans 2,500 Nos.

We hold comprehensive wooden and steel formwork material (plywood, beam/column forms, bracings, mild steel clamps) to cater to simultaneous shuttering work of at least two buildings with individual areas of about 50,000 sq.ft.

Temporary Structures

We own prefabricated MS pipe sheds with GI sheet roofing for the secure storage of cement and other materials. We have the immediate capability to construct at least 10 temporary structures (300 sq.ft. each).

Additionally, we can rapidly deploy temporary hutting facilities on any worksite to comfortably accommodate up to 2,000 laborers.